Timber sleeper raised beds in a garden

Groundworks in Atherstone

Herringbone block paving driveway in grey and charcoal, with matching edge details

A driveway that sinks, cracks or ruts after a few years almost always has the same cause: not enough work underneath. In Atherstone, as everywhere we cover from our Nuneaton base, we treat the groundwork as the most important part of the job.

Tarmac driveway on a detached house, finished with block paving edging

Digging out properly

Cars are heavy, and the weight has to be spread through the ground. We remove the old surface and dig down to a depth that suits the finish and the traffic it will carry, taking out soft material that would otherwise move. If we find anything unexpected once the old surface is up, such as soft spots or old foundations, we'll stop and talk it through with you before carrying on.

The sub-base

The sub-base is the layer of crushed stone that carries the load. We lay it in stages and compact each one thoroughly with a plate compactor. Cutting corners here is the usual reason driveways dip where the wheels run.

Edges that hold everything in

Without a firm edge, a driveway can creep outwards over time. Kerbs or block edging set on concrete lock the surface in place and give it a clean, finished line.

Planning for rain

A large new hard surface sends a lot of water somewhere. We set falls carefully and add channel drains or a soakaway where needed, so rainwater stays on your property and away from the house.

The same team for the finish

Because we also lay block paving, tarmac and resin, the people preparing the ground know exactly what the finish needs. Nothing gets lost between trades.

We hold public liability insurance. A 1-year company workmanship warranty; materials carry a 5-year supplier warranty.

Call 07429 774562 to talk through your driveway.

Why does my old driveway have dips in it?

Dips usually mean the sub-base was too thin or not compacted well enough, so it has settled under the weight of cars.

Does a new front driveway need drainage?

Rainwater needs to drain onto your own land rather than the road, or planning permission may be needed. We plan the drainage with that in mind.

Will you take up the old surface?

Yes. Lifting the old driveway and digging out is part of the groundwork stage.

Get a free quote for work in Nuneaton, Coventry and nearby

Call us on 07429 774562 for advice and a free quote, or send a quote request.

Call 07429 774562 Get your free quote